Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.creatorMuñoz-Villamizar, A. (Andres)-
dc.creatorSantos, J. (Javier)-
dc.creatorMontoya-Torres, J. (Jairo)-
dc.creatorAlvaréz, M.J. (Maria Jesus)-
dc.date.accessioned2022-01-13T17:02:04Z-
dc.date.available2022-01-13T17:02:04Z-
dc.date.issued2019-
dc.identifier.citationMuñoz-Villamizar, A. (Andres); Santos, J. (Javier); Montoya-Torres, J. (Jairo); et al. "Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study". International Journal of Industrial Engineering Computations. 10 (2019), 2019, 375 - 392es
dc.identifier.issn1923-2934-
dc.identifier.urihttps://hdl.handle.net/10171/62720-
dc.description.abstractThis paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing productivity. We defined a mixed-integer linear programming formulation of the parallel machine scheduling problem with four different objective functions in order to compare different scheduling configurations. Real data, from a plastic container manufacturing company located in the Basque Country (Spain), were used to validate this approach. A sensitivity analysis was performed with different production capacities and earliness/tardiness costs in order to evaluate the trade-offs between economic performance (i.e., costs) and the partial rates of OEE (i.e., quality, performance and availability). The objective of this study is to propose a guideline to help management make decisions regarding the measurement and improvement of scheduling effectiveness through contemplating earliness, tardiness and variable setup times.es_ES
dc.language.isoenges_ES
dc.publisherGrowing Sciencees_ES
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectProduction schedulinges_ES
dc.subjectEarliness/tardinesses_ES
dc.subjectOEEes_ES
dc.subjectOptimizationes_ES
dc.subjectMulti-objectivees_ES
dc.subjectKPI’ses_ES
dc.titleImproving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case studyes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.noteThis is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CCBY) license (http://creativecommons.org/licenses/by/4.0/).es_ES
dc.identifier.doi10.5267/j.ijiec.2019.2.001-
dadun.citation.endingPage392es_ES
dadun.citation.number2019es_ES
dadun.citation.publicationNameInternational Journal of Industrial Engineering Computationses_ES
dadun.citation.startingPage375es_ES
dadun.citation.volume10es_ES

Ficheros en este ítem:
Vista previa
Fichero
IJIEC_2019_2.pdf
Descripción
Tamaño
451.99 kB
Formato
Adobe PDF


Estadísticas e impacto
0 citas en
0 citas en

Los ítems de Dadun están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.