Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.creator | Muñoz-Villamizar, A. (Andres) | - |
dc.creator | Santos, J. (Javier) | - |
dc.creator | Montoya-Torres, J. (Jairo) | - |
dc.creator | Alvaréz, M.J. (Maria Jesus) | - |
dc.date.accessioned | 2022-01-13T17:02:04Z | - |
dc.date.available | 2022-01-13T17:02:04Z | - |
dc.date.issued | 2019 | - |
dc.identifier.citation | Muñoz-Villamizar, A. (Andres); Santos, J. (Javier); Montoya-Torres, J. (Jairo); et al. "Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study". International Journal of Industrial Engineering Computations. 10 (2019), 2019, 375 - 392 | es |
dc.identifier.issn | 1923-2934 | - |
dc.identifier.uri | https://hdl.handle.net/10171/62720 | - |
dc.description.abstract | This paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing productivity. We defined a mixed-integer linear programming formulation of the parallel machine scheduling problem with four different objective functions in order to compare different scheduling configurations. Real data, from a plastic container manufacturing company located in the Basque Country (Spain), were used to validate this approach. A sensitivity analysis was performed with different production capacities and earliness/tardiness costs in order to evaluate the trade-offs between economic performance (i.e., costs) and the partial rates of OEE (i.e., quality, performance and availability). The objective of this study is to propose a guideline to help management make decisions regarding the measurement and improvement of scheduling effectiveness through contemplating earliness, tardiness and variable setup times. | es_ES |
dc.language.iso | eng | es_ES |
dc.publisher | Growing Science | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | Production scheduling | es_ES |
dc.subject | Earliness/tardiness | es_ES |
dc.subject | OEE | es_ES |
dc.subject | Optimization | es_ES |
dc.subject | Multi-objective | es_ES |
dc.subject | KPI’s | es_ES |
dc.title | Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.note | This is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CCBY) license (http://creativecommons.org/licenses/by/4.0/). | es_ES |
dc.identifier.doi | 10.5267/j.ijiec.2019.2.001 | - |
dadun.citation.endingPage | 392 | es_ES |
dadun.citation.number | 2019 | es_ES |
dadun.citation.publicationName | International Journal of Industrial Engineering Computations | es_ES |
dadun.citation.startingPage | 375 | es_ES |
dadun.citation.volume | 10 | es_ES |
Ficheros en este ítem:
Estadísticas e impacto
Los ítems de Dadun están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.